Students arrive on a date that doesn’t move. Neither does our programme.
Dilapidations, kitchen replacement, room refurbishment and carpet and vinyl flooring for universities and student accommodation providers — delivered inside the summer window and handed back clean for the start of term.
student rooms refurbished
communal and cluster-flat kitchens
per scheme, start to handover
to mobilise, no recruitment
The works that have to happen between July and September.
One team prices it, programmes it and delivers it — so there’s one person accountable for the intake date, not a chain of contractors.
Two campuses. Two summers. Both ready for the start of term.
Planned in spring. Built in summer. Handed back for term.
Survey in term
Rooms and kitchens surveyed, scoped and priced while there’s still time to plan.
Programme to the intake
Sequenced block by block, working back from the date students arrive.
Mobilise fast
On site within one to four weeks, with every trade managed by us end to end.
Deliver, block by block
Accommodation and site teams kept informed before, during and after — no surprises.
Snag and hand back
Before-and-after photos, a checked completion pack and every room ready for term.
CDM on every job, led from the top.
Every enquiry is assessed for CDM before anyone is scheduled, with site-specific RAMS briefed and signed. Our teams are CSCS carded, IPAF trained and asbestos aware. Group record 2022 to 2025: zero major injuries, zero enforcement notices, zero prosecutions.
