The Requirment
The existing vinyl flooring in the depot office and corridor area had worn through, lifted around access hatches, and was no longer fit for a busy operational environment. The client required a hard-wearing, slip-resistant replacement that could withstand heavy daily foot traffic, be easy to clean, and meet current safety standards — installed without disrupting day-to-day depot operations.
Our Solution
4 Construction Management delivered the works end-to-end, programmed to suit the depot’s operational requirements. The full scope of works included:
Outcome
A fully replaced, slip-resistant Altro safety floor — durable, hygienic, easy to clean, and ready for years of heavy depot use. Delivered with minimum disruption to live operations.