Watery Lane Industrial Estate

The external elements of the building, including the cladding, doors, roller shutters, bollards, and windows, underwent a full programme of rejuvenation to restore their appearance and extend their service life. All surfaces were thoroughly prepared using a 3500 PSI jet wash to remove built-up dirt, contaminants, and any loose or deteriorating coatings. Following this, a comprehensive coating system was applied, beginning with a suitable primer to ensure proper adhesion, followed by an undercoat to build coverage and durability, and finally a high-quality topcoat to provide a long-lasting, protective finish. This process not only enhanced the overall aesthetic of the property but also delivered improved protection against weathering and ongoing wear and tear.

Project Details

Location

Blackburn

Industry

Industrial

Type

Scheduled works for Landlord

Duration

2 Weeks

Cost

£35k

Project Photos