Winslow House

Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old period building serving as a working head office. Over a threemonth programme, tired, dated office space was transformed into a bright, high-specification modern workplace while restoring the character of the historic building. Location Liverpool Industry Commercial Office Type Fit-Out & Refurbishment Duration 3 Months Cost £POA The [...]

By |August 2nd, 2026|Categories: |Tags: |0 Comments

Transpennine Trading Estate

Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment Duration 4 Months Cost £780k The Requirment Three industrial units at Transpennine Trading Estate, Gorrels Way, Rochdale — Units 5A/5B (a paired unit), Unit 5C, and Unit 4D — each in need of significant investment to bring them up to modern industrial and office standards. The landlord required a comprehensive refurbishment covering the full building envelope, internal fit-out, all external [...]

By |June 17th, 2026|Categories: , |Tags: , |0 Comments

Arriva TrainCare, Cambridge Depot

Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirment The existing vinyl flooring in the depot office and corridor area had worn through, lifted around access hatches, and was no longer fit for a busy operational environment. The client required a hard-wearing, slip-resistant replacement that could withstand heavy daily foot traffic, be easy to clean, and meet current safety standards — [...]

By |May 15th, 2026|Categories: |Tags: |0 Comments

Wetherspoons Aberystwyth

Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirment The client required a complete refurbishment of an existing accessible bathroom — stripping out tired, worn fixtures and finishes, and replacing with a clean, durable, hygienic specification suitable for ongoing public/commercial use. All accessibility fittings (grab rails, baby change unit, low-level sanitaryware, accessible mirror) needed to be reinstated to current standards. The [...]

By |April 30th, 2026|Categories: |Tags: |0 Comments

B&M Hylton – Temporary Works Solution

Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural Duration 1 Week Cost £37k The challenge As part of the wider works at B&M Hylton, an existing wall required full lateral restraint to allow adjoining works to be completed safely. The wall had to remain fully supported throughout the programme — with no movement, no damage to the host structure, and clear working access maintained for the trades [...]

By |April 30th, 2026|Categories: |Tags: |0 Comments

B&M Burslem

Your Content Goes Here A structural survey identified that the wall had become unsafe and posed a potential risk, requiring immediate remedial action. Following this assessment, a comprehensive programme of works was undertaken, and within three weeks all dangerous sections of the wall were carefully dismantled and removed. The affected areas were then fully rebuilt in line with the required specifications, ensuring both structural integrity and long-term durability. To further reinforce the wall and prevent future movement or cracking, HeliBars were installed as part of the strengthening process, providing additional stability and extending the lifespan of the structure. [...]

By |February 13th, 2015|Categories: |Tags: |0 Comments

Hillfoot Trading Estate

Your Content Goes Here Three units had reached the end of their serviceable life in terms of cladding and required refurbishment. The roofing system was upgraded using Drisline, with the gutters also relined to ensure improved performance and longevity. Rooflights were replaced with step-safe units to enhance safety and durability. The cladding was treated and sprayed with Zinsser AllCoat to provide a high-quality protective finish, while the brickwork was carefully repointed to restore structural integrity and appearance. Additionally, external floodlights were upgraded to new PIR LED units for improved energy efficiency and security, and the emergency exit was [...]

By |February 13th, 2015|Categories: |Tags: |0 Comments
  • Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old [...]

    Published On: August 2nd, 2026Categories: 2.4 min readViews: 25
  • Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment [...]

    Published On: June 17th, 2026Categories: , 2.8 min readViews: 211
  • Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]

    Published On: May 15th, 2026Categories: 1.4 min readViews: 228
  • Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]

    Published On: April 30th, 2026Categories: 1 min readViews: 228
  • Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural [...]

    Published On: April 30th, 2026Categories: 1.8 min readViews: 249
  • Your Content Goes Here A structural survey identified that the wall had become unsafe and posed a potential risk, requiring immediate remedial action. Following this assessment, a comprehensive programme [...]

    Published On: February 13th, 2015Categories: 0.9 min readViews: 264
  • Your Content Goes Here Three units had reached the end of their serviceable life in terms of cladding and required refurbishment. The roofing system was upgraded using Drisline, [...]

    Published On: February 13th, 2015Categories: 0.9 min readViews: 233