Primark, Coventry

Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn existing flooring and applying a new anti-slip coating to restore a safe, durable surface for daily deliveries. Location Coventry Industry Retail Type Flooring & Anti-Slip Coating Duration 2 Days Cost £9k The Requirment The loading ramp at Primark's Broadgate store had worn flooring that no [...]

By |August 7th, 2026|Categories: |Tags: |0 Comments

B&M Hylton – Temporary Works Solution

Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural Duration 1 Week Cost £37k The challenge As part of the wider works at B&M Hylton, an existing wall required full lateral restraint to allow adjoining works to be completed safely. The wall had to remain fully supported throughout the programme — with no movement, no damage to the host structure, and clear working access maintained for the trades [...]

By |April 30th, 2026|Categories: |Tags: |0 Comments

Ladbrokes Moreton

Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, damaged fascia and soffit, and areas of compromised brickwork. The roof required full replacement, while both the timber paintwork and masonry coatings were found to be flaking and in need of refurbishment to restore the building’s condition and appearance. Project Details Location Wirral Industry Commercial Type Building Maintenance Duration 3 Weeks [...]

By |March 22nd, 2026|Categories: |Tags: |0 Comments

B&M Burslem

Your Content Goes Here A structural survey identified that the wall had become unsafe and posed a potential risk, requiring immediate remedial action. Following this assessment, a comprehensive programme of works was undertaken, and within three weeks all dangerous sections of the wall were carefully dismantled and removed. The affected areas were then fully rebuilt in line with the required specifications, ensuring both structural integrity and long-term durability. To further reinforce the wall and prevent future movement or cracking, HeliBars were installed as part of the strengthening process, providing additional stability and extending the lifespan of the structure. [...]

By |February 13th, 2015|Categories: |Tags: |0 Comments
  • Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn [...]

    Published On: August 7th, 2026Categories: 1.2 min readViews: 55
  • Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural [...]

    Published On: April 30th, 2026Categories: 1.8 min readViews: 274
  • Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, [...]

    Published On: March 22nd, 2026Categories: 0.6 min readViews: 304
  • Your Content Goes Here New Aluminium windows installed, vertical concrete repairs made to the upstands, new bird spikes & back of house decoration Project Details [...]

    Published On: February 13th, 2015Categories: 0.3 min readViews: 348
  • Your Content Goes Here A structural survey identified that the wall had become unsafe and posed a potential risk, requiring immediate remedial action. Following this assessment, a comprehensive programme [...]

    Published On: February 13th, 2015Categories: 0.9 min readViews: 286
Go to Top