Primark, Coventry
Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn existing flooring and applying a new anti-slip coating to restore a safe, durable surface for daily deliveries. Location Coventry Industry Retail Type Flooring & Anti-Slip Coating Duration 2 Days Cost £9k The Requirment The loading ramp at Primark's Broadgate store had worn flooring that no [...]
Winslow House
Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old period building serving as a working head office. Over a threemonth programme, tired, dated office space was transformed into a bright, high-specification modern workplace while restoring the character of the historic building. Location Liverpool Industry Commercial Office Type Fit-Out & Refurbishment Duration 3 Months Cost £POA The [...]
Transpennine Trading Estate
Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment Duration 4 Months Cost £780k The Requirment Three industrial units at Transpennine Trading Estate, Gorrels Way, Rochdale — Units 5A/5B (a paired unit), Unit 5C, and Unit 4D — each in need of significant investment to bring them up to modern industrial and office standards. The landlord required a comprehensive refurbishment covering the full building envelope, internal fit-out, all external [...]
Arriva TrainCare, Cambridge Depot
Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirment The existing vinyl flooring in the depot office and corridor area had worn through, lifted around access hatches, and was no longer fit for a busy operational environment. The client required a hard-wearing, slip-resistant replacement that could withstand heavy daily foot traffic, be easy to clean, and meet current safety standards — [...]
Wetherspoons Aberystwyth
Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirment The client required a complete refurbishment of an existing accessible bathroom — stripping out tired, worn fixtures and finishes, and replacing with a clean, durable, hygienic specification suitable for ongoing public/commercial use. All accessibility fittings (grab rails, baby change unit, low-level sanitaryware, accessible mirror) needed to be reinstated to current standards. The [...]
B&M Hylton – Temporary Works Solution
Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural Duration 1 Week Cost £37k The challenge As part of the wider works at B&M Hylton, an existing wall required full lateral restraint to allow adjoining works to be completed safely. The wall had to remain fully supported throughout the programme — with no movement, no damage to the host structure, and clear working access maintained for the trades [...]
Ladbrokes Moreton
Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, damaged fascia and soffit, and areas of compromised brickwork. The roof required full replacement, while both the timber paintwork and masonry coatings were found to be flaking and in need of refurbishment to restore the building’s condition and appearance. Project Details Location Wirral Industry Commercial Type Building Maintenance Duration 3 Weeks [...]
Nandos Blackpool
Your Content Goes Here New Aluminium windows installed, vertical concrete repairs made to the upstands, new bird spikes & back of house decoration Project Details Location Blackpool Industry Retail Type Building Maintenance Duration 2 Weeks Cost £23k Project Photos
Watery Lane Industrial Estate
Your Content Goes Here The external elements of the building, including the cladding, doors, roller shutters, bollards, and windows, underwent a full programme of rejuvenation to restore their appearance and extend their service life. All surfaces were thoroughly prepared using a 3500 PSI jet wash to remove built-up dirt, contaminants, and any loose or deteriorating coatings. Following this, a comprehensive coating system was applied, beginning with a suitable primer to ensure proper adhesion, followed by an undercoat to build coverage and durability, and finally a high-quality topcoat to provide a long-lasting, protective finish. This process not only enhanced the [...]
B&M Burslem
Your Content Goes Here A structural survey identified that the wall had become unsafe and posed a potential risk, requiring immediate remedial action. Following this assessment, a comprehensive programme of works was undertaken, and within three weeks all dangerous sections of the wall were carefully dismantled and removed. The affected areas were then fully rebuilt in line with the required specifications, ensuring both structural integrity and long-term durability. To further reinforce the wall and prevent future movement or cracking, HeliBars were installed as part of the strengthening process, providing additional stability and extending the lifespan of the structure. [...]
Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn [...]
Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old [...]
Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment [...]
Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]
Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]
Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural [...]
Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, [...]
Your Content Goes Here New Aluminium windows installed, vertical concrete repairs made to the upstands, new bird spikes & back of house decoration Project Details [...]
Your Content Goes Here The external elements of the building, including the cladding, doors, roller shutters, bollards, and windows, underwent a full programme of rejuvenation to restore their appearance [...]