Exolum, Backford

Your Content Goes Here Project Details 4CM were called back by Exolum to their Backford aviation fuel terminal near Chester for a second phase of road works: critical C40 concrete repairs on the live jet road, and new kerbing and resurfacing on the emergency fire access road, with the terminal live and trading throughout. Location Backford, Chester Industry Aviation Fuel (COMAH) Type Groundworks, Concrete & Surfacing Duration Oct – Nov 2026 Role Principal Contractor [...]

By |November 23rd, 2026|Categories: |Tags: |0 Comments

Primark, Coventry

Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn existing flooring and applying a new anti-slip coating to restore a safe, durable surface for daily deliveries. Location Coventry Industry Retail Type Flooring & Anti-Slip Coating Duration 2 Days Cost £9k The Requirement The loading ramp at Primark's Broadgate store had worn flooring that no [...]

By |August 7th, 2026|Categories: |Tags: |0 Comments

Winslow House

Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old period building serving as a working head office. Over a threemonth programme, tired, dated office space was transformed into a bright, high-specification modern workplace while restoring the character of the historic building. Location Liverpool Industry Commercial Office Type Fit-Out & Refurbishment Duration 3 Months Cost £POA The [...]

By |August 2nd, 2026|Categories: |Tags: |0 Comments

Transpennine Trading Estate

Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment Duration 4 Months Cost £780k The Requirement Three industrial units at Transpennine Trading Estate, Gorrels Way, Rochdale — Units 5A/5B (a paired unit), Unit 5C, and Unit 4D — each in need of significant investment to bring them up to modern industrial and office standards. The landlord required a comprehensive refurbishment covering the full building envelope, internal fit-out, all external [...]

By |June 17th, 2026|Categories: , |Tags: , |0 Comments

Arriva TrainCare, Cambridge Depot

Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirement The existing vinyl flooring in the depot office and corridor area had worn through, lifted around access hatches, and was no longer fit for a busy operational environment. The client required a hard-wearing, slip-resistant replacement that could withstand heavy daily foot traffic, be easy to clean, and meet current safety standards — [...]

By |May 15th, 2026|Categories: |Tags: |0 Comments

Wetherspoons Aberystwyth

Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment Duration 1 Week Cost £6.5k The Requirement The client required a complete refurbishment of an existing accessible bathroom — stripping out tired, worn fixtures and finishes, and replacing with a clean, durable, hygienic specification suitable for ongoing public/commercial use. All accessibility fittings (grab rails, baby change unit, low-level sanitaryware, accessible mirror) needed to be reinstated to current standards. The [...]

By |April 30th, 2026|Categories: |Tags: |0 Comments

B&M Hylton – Temporary Works Solution

Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural Duration 1 Week Cost £37k The challenge As part of the wider works at B&M Hylton, an existing wall required full lateral restraint to allow adjoining works to be completed safely. The wall had to remain fully supported throughout the programme — with no movement, no damage to the host structure, and clear working access maintained for the trades [...]

By |April 30th, 2026|Categories: |Tags: |0 Comments

Ladbrokes Moreton

Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, damaged fascia and soffit, and areas of compromised brickwork. The roof required full replacement, while both the timber paintwork and masonry coatings were found to be flaking and in need of refurbishment to restore the building’s condition and appearance. Project Details Location Wirral Industry Commercial Type Building Maintenance Duration 3 Weeks [...]

By |March 22nd, 2026|Categories: |Tags: |0 Comments

Watery Lane Industrial Estate

Your Content Goes Here The external elements of the building, including the cladding, doors, roller shutters, bollards, and windows, underwent a full programme of rejuvenation to restore their appearance and extend their service life. All surfaces were thoroughly prepared using a 3500 PSI jet wash to remove built-up dirt, contaminants, and any loose or deteriorating coatings. Following this, a comprehensive coating system was applied, beginning with a suitable primer to ensure proper adhesion, followed by an undercoat to build coverage and durability, and finally a high-quality topcoat to provide a long-lasting, protective finish. This process not only enhanced the [...]

By |February 13th, 2015|Categories: |Tags: |0 Comments
  • Your Content Goes Here Project Details 4CM were called back by Exolum to their Backford aviation fuel terminal near Chester for a second phase of road [...]

    Published On: November 23rd, 2026Categories: 2.9 min readViews: 343
  • Your Content Goes Here Project Details 4CM was appointed by Primark to re-coat the loading ramp at their Broadgate store in Coventry — removing the worn [...]

    Published On: August 7th, 2026Categories: 1.2 min readViews: 340
  • Your Content Goes Here Project Details 4 Construction Management Ltd (4CM) was appointed to deliver a complete refurbishment of Winslow House — a handsome 200-year-old [...]

    Published On: August 2nd, 2026Categories: 2.4 min readViews: 335
  • Your Content Goes Here Project Details Location Rochdale Industry Industrial Type Refurbishment [...]

    Published On: June 17th, 2026Categories: , 2.8 min readViews: 631
  • Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]

    Published On: May 15th, 2026Categories: 1.4 min readViews: 564
  • Your Content Goes Here Project Details Location Aberystwyth Industry Hospitality Type Refurbishment [...]

    Published On: April 30th, 2026Categories: 1 min readViews: 476
  • Your Content Goes Here Project Details Location Sunderland Industry Retail Type Structural [...]

    Published On: April 30th, 2026Categories: 1.8 min readViews: 463
  • Your Content Goes Here A dilapidation report was carried out, highlighting a number of issues that required attention at the store. These included loose render to the front elevation, [...]

    Published On: March 22nd, 2026Categories: 0.6 min readViews: 469
  • Your Content Goes Here New Aluminium windows installed, vertical concrete repairs made to the upstands, new bird spikes & back of house decoration Project Details [...]

    Published On: February 13th, 2015Categories: 0.3 min readViews: 512
  • Your Content Goes Here The external elements of the building, including the cladding, doors, roller shutters, bollards, and windows, underwent a full programme of rejuvenation to restore their appearance [...]

    Published On: February 13th, 2015Categories: 0.8 min readViews: 524
Go to Top